It is a long and productive day! Since the interior vertical framing of the wood wall is already attached to the steel posts, We nailed horizontal wood pieces on both side with perfect level. For the chain link walls, we attached free hanging chain links to the bottom frame members with steel bars. We also dig ditches along inside edges of chapel and assembled one side of the wood edge fixed by vertical steel bars so far. There is still some work left, but we are almost there!