Green Chapel: 5/16, Build Day 7

It’s our second last day and we are almost there! Even though it’s volunteer day today, we are still very productive. We finished attaching all the chain links to the bottom frame by steel bars. Now the fence walls were straight and tight. For the ground, both side wood edges were assembled and sealed by clay. The middle ground was spread with black sheet and covered by a lay of rocks. Everything was almost done and we looked forward to Friday, the finish day!